My 'Man Cave'

This web page under construction.

Man Cave objectives:

 

 

 

 

 

 

 

 

Figure 1

This is the existing structure.

The basement walls are clay tile. They are 7'-4" high. The ceiling is open 9" x 1 1/2" floor joists.

Figure 2

View showing screen and plaster.

Using a trowel I applied the plaster of paris onto the screen. The screen is tacked to the top of the door frame and then folded up

Figure 3

 

Figure 4

 

 

Figure 5

 

 

Figure 6

 

Figure 7

 

Figure 8

 

 

Figure 9